MikeA
Member
- First Name
- Mike
- Joined
- Apr 25, 2025
- Threads
- 1
- Messages
- 10
- Reaction score
- 5
- Location
- Pennsylvania
- Vehicles
- Rivian R1T
- Thread starter
- #1
In lieu of a configurator yet I am wondering likely costs for the options. For example the large battery is 30kWh larger than the standard battery and at a cost of $100-125 per kWh I expect this will be a $5,000 option. For the SUV conversion I would think a similar cost since on the Jeep the plastic cover is over $1000 and the roll bar and seats are needed to be added. Other thoughts?